11pies. of 4mm plate at Ghc. 220.00 = GHC. 2,420.00 1 packet of welding rod at Ghc 15.00 = GHC 15.00 hiring of grinding machine GHC 50.00 T & T GHC 100.00 2pies. Cutting Stone at GHC. 10.00 = GHC. 20.00 ---------------------- GRAND TOTAL GHC 2,605.00 -----------------------
AKUSE ESTIMATE
3 pots one at GHC. 60.00 = GHC. 180.00 4 valves one at GHC. 40.00 = GHC. 160.00 4 connectors one at GHC. 20.00 = GHC. 80.00 2 1inche pipe one at GHC. 30.00 = GHC. 60.00 1 packet of welding rod GHC. 15.00 = GHC. 15.00 2 pies. of cutting stone one at GHC 10.00 = GHC 20.00 2 1.5 horse power motor one GHC 250.00 = GHC 500.00 flate bar GHC. 40.00 2inches angle bar GHC 50.00 molding of the motor case GHC 30.00 halt inche 2mm plate GHC 55.00 holes and clips GHC 50.00
------------------------ GRAND TOTAL GHC 1,540.00 ------------------------
SUPPLE OF PALM KENNEL --------------------------------------------- 100 bags one bags at GHC. 6.00 = GHC .600.00 loading in and out GHC 100.00 T & T to Akuse GHC 300.00 ------------------ GHC. 1,000.00 -------------------
4 1/2 inches u bar to support the 3 tanks GHC 400.00 3inches u bar for the benners GHC 500.00 3 valves one at GHC 40.00 = GHC. 120.00 3 valves connectors one at GHC 20.00 = GHC 60.00 2 t bars one at GHC 20.00 = GHC 40.00 6pies 1inche pipe one at GHC 35.00 = GHC210.00 1 3horse power motor GHC 300.00 1 packet at GHC 15.00 = GHC 15.00 1 cutting stone GHC 10.00 2 motor concrate bolts one at GHC 15.00 = GHC 30.00 earth works GHC 500.00 electrical works GHC 200.00 ceramics works GHC 500.00 holes and clips GHC 50.00 ------------------- GRAND TOTAL GHC 3,035.00 ---------------------
pokuase
ReplyDelete-------------
11pies. of 4mm plate at Ghc. 220.00 = GHC. 2,420.00
1 packet of welding rod at Ghc 15.00 = GHC 15.00
hiring of grinding machine GHC 50.00
T & T GHC 100.00
2pies. Cutting Stone at GHC. 10.00 = GHC. 20.00
----------------------
GRAND TOTAL GHC 2,605.00
-----------------------
AKUSE ESTIMATE
3 pots one at GHC. 60.00 = GHC. 180.00
4 valves one at GHC. 40.00 = GHC. 160.00
4 connectors one at GHC. 20.00 = GHC. 80.00
2 1inche pipe one at GHC. 30.00 = GHC. 60.00
1 packet of welding rod GHC. 15.00 = GHC. 15.00
2 pies. of cutting stone one at GHC 10.00 = GHC 20.00
2 1.5 horse power motor one GHC 250.00 = GHC 500.00
flate bar GHC. 40.00
2inches angle bar GHC 50.00
molding of the motor case GHC 30.00
halt inche 2mm plate GHC 55.00
holes and clips GHC 50.00
------------------------
GRAND TOTAL GHC 1,540.00
------------------------
SUPPLE OF PALM KENNEL
---------------------------------------------
100 bags one bags at GHC. 6.00 = GHC .600.00
loading in and out GHC 100.00
T & T to Akuse GHC 300.00
------------------
GHC. 1,000.00
-------------------
AKWATIA BOADUA ESTIMATE
-----------------------------------------------
4 1/2 inches u bar to support the 3 tanks GHC 400.00
3inches u bar for the benners GHC 500.00
3 valves one at GHC 40.00 = GHC. 120.00
3 valves connectors one at GHC 20.00 = GHC 60.00
2 t bars one at GHC 20.00 = GHC 40.00
6pies 1inche pipe one at GHC 35.00 = GHC210.00
1 3horse power motor GHC 300.00
1 packet at GHC 15.00 = GHC 15.00
1 cutting stone GHC 10.00
2 motor concrate bolts one at GHC 15.00 = GHC 30.00
earth works GHC 500.00
electrical works GHC 200.00
ceramics works GHC 500.00
holes and clips GHC 50.00
-------------------
GRAND TOTAL GHC 3,035.00
---------------------